Forschungsdatensätze, Benchmark Instances
Multiple Plan Approach for a Dynamic Dial-a-Ride Problem
Multi Depot Pickup and Delivery Problem with Time Windows and Heterogeneous Vehicles
Collaborative Pickup and Delivery Problems with Time Windows and Heterogeneous Vehicle Fleets
Flexible Job Shop Scheduling with Sequencing Flexibility, Parallel Operations, and Transport Times
Müller, L. and Rieck, J. (2026):
Flexible Job Shop Scheduling with Sequencing Flexibility, Parallel Operations, and Transport Times.
Submitted to "International Journal of Production Research" (Under review).
Institut BWWI
Universität Hildesheim
Institut für Betriebswirtschaft und Wirtschaftsinformatik
Leitung: Prof. Dr. Anne Meißner
Postadresse:
Universitätsplatz 1
D-31141 Hildesheim
Besucheradresse:
Samelsonplatz 1
D-31141 Hildesheim
T +49 (0)5121.883-40604
F +49 (0)5121.883-40605